Thinking ahead to spring
In the last couple of weeks we’ve been busy setting the final grades of the driveway and parking areas at the Hazelnut Inn. We’ve also fabricated the armature for the ‘stone’ wall that will screen our residence next door from the parking lot of the Inn. Although it appears lower in the photograph, the wall is actually a little over six feet tall and will do the screening handily. The dug out area in front of the new wall will be filled with soil and lush landscaping. The welded structure is now ready for the sculpted concrete which will happen when it warms up in spring.