Ready For Insulation!

The interior spaces of the Copper Crown suite are clean and prepared for the arrival of our friends at Element Spray Foam first thing tomorrow. The space is cavernous and lofty, befitting a castle and difficult to photograph without a wide-angle lens. As a point of reference, the scaffold is about seventeen feet tall. The beginnings of the arched ceilings and beams are already blocked in. These ceilings and beams will be filled out fully once as the insulation is in place. It will be great to spend the winter working in a climate-controlled space!