The North Star suite’s sign is now welded in place. You will notice we still need to finish painting the rudder but that won’t take too long.
With the other two suite signs ready to be installed we couldn’t resist putting up the Copper Crown’s sign. It will be a while before we get back to this end of the Hazelnut Inn but it sure is nice to see a sign of things to come.
Yesterday, we installed the gate to the North Star suite’s private garden. It is a very hefty steel door (in fact I’ve seen safes made of flimsier steel) and it swings open like a dream!
The North Star suite’s sign has had its first test fit. We will finish the show side of the rudder before finally installing the sign.
Today we test fit the Under Hill’s sign in preparation for completing the suite’s garden wall. This sign is one of the first things we built for the Hazelnut Inn and I am really looking forward to installing it!
Today we installed the shutters on either side of the mechanical room doors. I am looking forward to seeing the rest of the wall finished up!